Planning a modular OT complex: decisions that shape the whole project

18 August 2026 · 6 min read

Panel finish is usually the last thing that matters. Airflow strategy, corridor separation and service routing decide how a theatre performs for the next fifteen years.

A modular operation theatre is an engineered system, not a cladding exercise. The panel finish becomes visible, but the performance of a theatre is set earlier — when the airflow strategy, pressure relationships and corridor separation are fixed on the layout.

Start with the surgical brief. Procedure mix, table position, imaging needs and staff movement decide the clear internal dimensions, the size of the laminar zone and the number of service points. Retrofitting a pendant or a second gas outlet after panels are installed is expensive and rarely tidy.

Air changes, filtration stages and pressure cascade should be documented as design intent before procurement. Without those numbers, commissioning has nothing to verify against, and disputes about performance appear at the worst possible moment.

Finally, plan the sequence. In a live hospital, the phasing plan — dust containment, alternate access, temporary isolation of gas zones — is as much part of the design as the theatre itself.

All articles

Project consultation

Planning a new facility, a department upgrade or an equipment purchase?

Share your requirement and our engineering team will respond with clarifying questions, a suggested scope and — where a site visit is needed — a proposed visit date.

Call usGet a quote