- Design verification
- Every layout and services drawing is reviewed against the clinical brief, applicable standards and the client's operational plan before release for execution.
- Material approval
- Panel systems, gas components, filters and finishes are submitted for written approval with technical data before procurement.
- Inspection checkpoints
- Defined hold points during fabrication and installation, recorded with photographs and sign-off.
- Testing & validation
- Pressure and leak testing for gas systems, airflow, particulate and pressure-cascade verification for cleanrooms, and functional testing of controls.
- Handover documentation
- As-built drawings, test certificates, equipment manuals, warranty terms and a preventive maintenance schedule.
- Post-handover review
- A structured review after commissioning to confirm the facility performs as intended in daily use.